Swindon
01793 205 053
Southampton
023 8181 9985
Reading
0118 336 0337
Out of hours: 0800 135 7046
Case Studies
Case Studies

Case Studies

 Follow us on Twitter
Triumph International, Clarks Village, Somerset

Triumph International

When Triumph International made the decision to close their store at Clarks Village, Lollypop FM were awarded the contract for dilapidations; a fully managed project including electrical work, air conditioning, removals and repairs...
Read more

Tencate Advanced Materials

Tencate Advanced Materials

Following the cessation of their tenancy, Tencate contracted Lollypop Facilities management to carry out dilapidation works on the leased property. Works included removals, deep cleaning, full internal redecoration, electrical and plumbing maintenance works, external jet washing and landscaping. On completion, the client had the following testimonial...
Read more

Honda

Honda Swindon

Newly appointed contractors carry out decorations and door furniture upgrade to Honda UK office complex in Swindon. Due to the nature & security surrounding the building, working closely with the building manager to deliver the services has been key to this project. Working over several weekends to ensure no disruption of production.
Read more

Poole Quarter

Poole Quarter

Lollypop has been the main contractor at PQ for over 8 years appointed by a board of directors. We have been delivering services daily to ensure the development is kept up to the correct standards. Working closely with the managing agent & directors we have been able to run out a LED lighting project, to save lighting costs moving forward.
Read more

South Western House

South Western House

Lollypop has been the main contractor at SWH for the last 2 years, appointed by a board of directors to facilitate the development. At the start of the relationship we found a beautiful historic listed building that was lacking “some love’.
Read more

Triumph International

Triumph International

Lollypop was awarded the contract to service Triumph International stores and their prestige London head office. Having to provide a wide range of services weekly and mostly “out of hours” the services range from general maintenance to planned shop fitting.
Read more

Swindon Town Football Club

Swindon Town Football Club

Appointed as Fire & Security contracts to Swindon Town Football Club, is great recognition to the hard work and high standards of all the team. Providing security for over 9000 people on a match day is no mean feet, with having to have CCTV, Fire and access control all up and running in preparation for the visitors, can be challenging.
Read more

Delta 200

Delta 200

A newly appointed contract to supply daily cleaning and caretaker services to a fast paced office complex in Swindon. Having the ability to provide the complex with its own FM manager is one of the ways we are looking to increase serviceability. A period of re training and on-site inspections is the way we have envisioned the client’s requirements.
Read more

Armstrong Court

Armstrong Court

Appointed by the board of directors to provide a full development facilities package, which has been tailored to the developments requirements. Working closely with one of the countries leading managing agents on a daily basis to deliver planned & reactive services. Reducing costs and raising service levels is what was required at AC.
Read more

Bo Lane

Paul UK

Paul UK, engaged with Lollypop to carry out "shop fitting" for their stores in London. Having only a 5-day closure to carry out the required works meant working around the clock 24/7, this in its self was a logistical headache, then throw in the location Bow Lane, London!!!
Read more

Armstrong Court

Domestic property owner

A residential client engages with Lollypop to re-design and build their dream garden, to include a Swim Spa, and large decked area ready for the summer. Working very closely with the property owner who was working to a dead line, the pressure was on, the client was critical on how the they envisioned the end result and workmanship had to be first class.
Read more